Skip to content
BangunTingkat
Prepare a brief

Five places to check before the rainy season

Arrange checks from the roof down to the entrance so staff can follow a clear route.

BangunTingkat editors
A garden and terraces at a multistorey residential building.

Rain-related reports often arrive together, from a slippery corridor to water pooling beside a door. In this example of a building with gardens, the team divides the route into five checks so each finding reaches the right person.

Roof drains and downpipes

The first point is where water enters the roof drain. The second is the outlet of the downpipe. Staff record blockages visible from safe positions and schedule a technician with appropriate access for the remaining sections.

Corridors and door thresholds

The third point is a pedestrian route exposed to wind-driven rain. The fourth is where a door meets the floor. Mark any area still wet after the rain stops and compare your notes with what nearby residents have seen.

Storage spaces

The fifth point is the space used for tools or documents. Check that items are stored in a suitable position and identify a temporary space in case the room needs clearing. The final summary identifies routine observations and work that needs scheduling.

Repairs
Read next

Why vacancy figures need a little context

An occupancy percentage alone cannot tell you whether a unit is on the market or still under repair.

Made byTata Kelola Digital